TRUSTEX INDUSTRIES — PRODUCTION AND CAPACITY PLAN Editable worksheet. Replace illustrative assumptions with observed data. ORDER Style / approved specification revision / accepted quantity: Size-colour ratio / material readiness / delivery stages: WORK CONTENT AND CAPACITY (repeat by operation or line) Operation / included activities: Operators / machines / skill constraints: Available minutes per operator per day: Standard minutes per garment or operation / measurement basis: Effective efficiency assumption and basis: Allowances already included in standard time: Calculated output = operators x available minutes x efficiency / standard minutes: Observed output / inspected accepted output / rework: Constraint or bottleneck / action / responsible role: Illustration only: 10 operators x 480 minutes x 0.65 / 12 standard minutes = 260 garments per day, assuming balanced comparable work and no other constraint. This is not a promised output or a standard efficiency for every factory. OPERATING COST Included daily labour / equipment / overhead / other: Accepted daily output basis: Allocated cost per accepted piece = included daily cost / accepted daily output: Order charges / commercial allowance / scope exceptions: MILESTONES (repeat for each stage) Stage: material / sample / approval / cutting / assembly / finishing / inspection / dispatch Dependency / planned start / planned finish: Actual start / actual finish / output: Delay reason / corrective action / responsibility: HANDOVER Material received / shortages / defects: Approved reference / changes / rework responsibility: Accepted output / dispatch reference: Actual versus planned consumption / cost / lead time: